3 years warranty 500mA 12w Triac Dimmable LED Driver for led lighting
220vAC dimmable driver is a triac dimming mode,the input voltage is 180-265vAC,the wattage range is 8-40w.the PFC>0.9.SMARTS's triac constant current power supply is more stable than tagra led driver and can achieve smooth dimming.
Model |
SMT-028-0450CTH |
SMT-025-0500CTH |
SMT-020-0600CTH |
SMT-030-0400CTH |
|
Output |
DC Current |
450mA |
500mA |
600mA |
400mA |
|
Current Accuracy |
±5% |
|||
|
Voltage Range |
16-28V |
13-25V |
12-20V |
18-30V |
|
Rated power |
12W |
12W |
12W |
12W |
Input |
Voltage Range |
170~265VAC |
|||
|
Frequency Range |
47~63HZ |
|||
|
Power Factor (Typ.) |
PF>0.91/110V ; PF>0.93/220V ; PF>0.93/250V |
|||
|
Full Load Efficiency(Typ.) |
>84% |
>84% |
>85% |
>85% |
|
AC Current(Typ.) |
0.14A/110VAC 0.12 A/220VAC 0.01A/250VAC |
|||
|
Leakage current |
<0.27mA/110VAC; <0.25mA/220VAC |
|||
Protection |
Short Circuit |
Hiccup mode, recovers automatically after fault condition is removed. |
|||
|
Over voltage |
<150VAC@110V / <270VAC@220V |
|||
Environment |
Working TEMP. |
-40~+60℃ |
|||
|
Working Humidity |
20~90%RH,non-condensing |
|||
|
Storage TEM.,Humidity |
-40~+80℃,10~95%RH |
|||
|
TEMP.coefficient |
±0.03%/℃(0~50℃) |
|||
|
Vibration |
10~500Hz,2G 10min./1 cycle,period for 60min. each along X,Y,Z axes |
Analysis of related problems
Question1.:
What is your MOQ?
Answer: Our MOQ is 200pcs for each. But we accept trial order or sample order.
FAQ
Q1. What's the trade terms you can do??
A1: We accept EXW,FOB..(Optional)
Q2. What's shipping mode can we choose?
A2: Express, Ocean and air transportation (optional).
Q3. What's the MOQ?
A3: Our MOQ is 100pcs. better price for large quantity;
Q4. What can you do if the product is broken?
A4: We promise to replace new ones to you if there is any defective happen during the warranty period.
Q5. Can i get products with my own logo??
A5: Sure, you can, MOQ is 500pcs.
Q6. Can i get a sample for testing??
A6: Sure, but sample fees should be charged on your account.
Q7. What's the mormal lead time??
A7: 7 working days for samples, 15 working days for mass production.
Q8. What's the payment conditon?
A8: All are paid before production or 30% deposit and 70% before delivery (optional)
Q9. What's the Payment do you have?
A9: We accept payment be sent via T/T, L/C, Trade Assurance, WESTERN UNION, PAYPAL.