Class2 power supply 12v 20w triac dimmable led driver with UL CE ROHS FCC approval
vt1.0 series are UL CE ROHS FCC approval, this series are devide 2 parts,12v triac dimmable constant voltage led driver & 24v triac dimmable constant voltage led driver.
Model |
SMT-012-020VT |
SMT-024-020VT |
|
Output | DC Voltage | 12V | 24V |
Rated current | 1.67A | 0.83A | |
Rated Power | 20W | 20W | |
Input | Voltage Range |
100~130VAC / 170~265VAC |
100~130VAC / 170~265VAC |
Frequency Range |
47~63HZ |
47~63HZ |
|
Power Factor |
PF≥0.80 |
PF≥0.80 |
|
Efficiency |
>84% |
>84% |
|
AC current |
0.34A@120VAC, 0.18A@220VAC |
0.34A@120VAC, 0.18A@220VAC |
|
Leakage current |
less than 0.70mA/110VAC / less than0.5mA/220VAC |
||
Protection |
Short Circuit |
Hiccup mode, recovers automatically after fault condition is removed |
|
Over Current |
≤1.2*I out |
||
Over Loading |
≤120% |
||
Over temperature |
100℃±10℃ (The output voltage will turn off when the temperature is higher then100℃±10℃, after the temperature drop off ,it will recovery) automatic | ||
Environment |
Working temp. |
-40~+60℃ | |
Working humidity | 20~90%RH, non-condensing | ||
Storage TEMP. Humidity | -40~+80℃,10~95%RH | ||
TEMP .coefficient | ±0.03%/℃(0~50℃) | ||
Vibration | 10~500Hz,2G 10min./1 cycle,period for 60min. each along X,Y,Z axes | ||
Safety&EMC | Safety standards | UL8750+UL1310 | |
Withstand voltage | I/P-O/P:1500KVAC | ||
Isolation resistance | I/P-O/P:100MΩ/500VDC/25℃/70%RH | ||
EMC EMISSION | FCC Part 15 B | ||
other information | Warranty | 3 years | |
Case material | plastic | ||
Cetificate | CE/ROHS/FCC/UL | ||
Waterproof rate | IP 20 |
FAQ
Q1. What's the trade terms you can do??
A1: We accept EXW(Optional)
Q2. What's shipping mode can we choose?
A2: Express, Ocean and air transportation (optional).
Q3. What's the MOQ?
A3: Our MOQ is 10pcs. better price for large quantity;
Q4. What can you do if the product is broken?
A4: We promise to replace new ones to you if there is any defective happen during the warranty period.
Q5. Can i get products with my own logo??
A5: Sure, you can, MOQ is 500pcs.
Q6. Can i get a sample for testing??
A6: Sure, but sample fees should be charged on your account.
Q7. What's the mormal lead time??
A7: 7 working days for samples, 15 working days for mass production.
Q8. What's the payment conditon?
A8: All are paid before production or 30% deposit and 70% before delivery (optional)
Q9. What's the Payment do you have?
A9: We accept payment be sent via T/T, L/C, Trade Assurance, WESTERN UNION, PAYPAL.